Weisbender Contracting
785-776-5034

Master Bath — January 2019

Remove existing shower, shower door, vanity top & mirror.

Install new Onyx Shower basin, walls, corner caddy and foot rest; Raise the height of shower head and install semi-frameless shower door. Install Onyx vanity top and owner provided mirror. Re-install existing valves and toilet. Paint drywall surfaces.


Click on any of the photos below to view a larger version.


 

« BACK


Website designed & hosted by Outdoor Resources, LLC